|
| |

Mr. B. Y. Choi, Director, Engineering
Professional Record:
|
Position |
Dates |
Company |
|
Director |
2005-Present |
Offshore & Plant Technology Service Co. |
|
President/Engineering Mgr
|
2005.03.-Present |
Zenetch Engineering |
|
·
GE-JAE GRAN BRIDGE TURN KEY PJT
(Pier Caisson Dynamic Transportation Analysis with Wave
and Current/ Installation Dynamic Analysis/
3-Body Motion Time Domain Analysis Wet Towing and
Down-Ending, Up-Ending Analysis for DAEWOO
E&C CO., LTD) |
|
President/Engineering Mgr
|
2004.10.-Present |
Zenetch Engineering |
|
·
ILYANG CHO/BACKRYEONG
ISLAND OFFSHORE JACKET PJT (Jacket Inplace, Fatigue, Seismic, Transportation,
Construction Eng/Specification / Document Up-ending
analysis for KORDI) |
|
President/Engineering Mgr
|
2005.01.-2005.03 |
Zenetch Engineering |
|
·
PYEONG-TAEK PORT
TURNKEY PJT (Caisson Dynamic wave analysis/Container Crane Structure
Analysis/
Mooring Analysis/Ship impact Analysis/Silt Protection Dynamic
Analysis/Caisson Crack Propagation Analysis
/Submarine pipe line In-place and
Installation Analysis/Pile Fatigue Analysis for DAELIM E&C CO., LTD)
|
|
President/Engineering Mgr
|
2004.07.-2004.12 |
Zenetch Engineering |
|
·
BUSAN NAM-CONTAINER
PORT PJT (Wind tunnel dynamic analysis-CFD, Caisson Dynamic wave
analysis/
Container Crane Structure Analysis/Mooring Analysis/Ship impact
Analysis/Silt Protection Dynamic Analysis/
Caisson Crack Propagation
Analysis/SPM Dynamic Analysis/Pile Fatigue Analysis for
DAELIM
CONSTRUCTION&ENG CO., LTD) |
|
President/Engineering Mgr
|
2004.02.-2004.06 |
Zenetch Engineering |
|
·
JINHEA NAVAL PORT
TURN KEY PJT (Caisson Dynamic wave analysis/Container Crane Structure
Analysis/
Mooring Analysis/Ship impact Analysis/Silt Protection Dynamic
Analysis/Caisson Crack Propagation Analysis/
SPM Dynamic Analysis/Pile
Fatigue Analysis for POSCO E&C CO., LTD) |
|
President/Engineering Mgr
|
2003.11- 2004.02 |
Zenetch Engineering |
|
·
Development of tunnel
and bridge construction method. (FDM analysis of Tunnel and wind tunnel
development,
Bridge VIV and Arch. Bridge construction development) |
|
President/Engineering Mgr
|
2003.7.- 2003.11 |
Zenetch Engineering |
|
·
BUSAN NEW PORT-BUK
CONTAINER PORT TURN-KEY PJT (Caisson Dynamic Wave Analysis/Container Crane
Structure Analysis/Mooring Analysis/Ship impact Analysis/Silt Protection
Dynamic Analysis/Caisson Crack
Propagation Analysis/SPM Dynamic
Analysis/Pile Fatigue Analysis for HYUNDAI DEVELOPMENT CO., LTD.) |
|
President/Engineering Mgr
|
2003.1.-2003.12 |
Zenetch Engineering |
|
·
NC41C Offshore
Platform Project (Basic design for Vibration of machinery, Equipment
foundation, Flare Tower, Blasting
analysis due to LRFD and Construction
engineering for HYUNDAI HEAVY INDUSTRIES CO., LTD.) |
|
President/
Engineering Manager |
2003.01-2003.4.20 |
Zenetch Engineering |
|
·
KWANG YANG-JUNGMA
PORT TURN-KEY FOR DEALIM CONSTRUCTION CO., LTD (Mooring analysis and report,
Crane structural analysis and
report, Caisson Fatigue and FEM with elastic-plastic analysis, Seismic
analysis) |
|
President/
Engineering Manager |
2003. - 2003.4.26 |
Zenetch Engineering |
|
·
KWANG-YANG LNG
TERMINAL JETTY Project (Sea Transportation and motion design, Lifting padeye
design and
detailed design of Jetty
Structure for SUNG-CHANG CO., LTD.) |
|
Senior Vice President/Engineering Manager
|
2002.7 – 2003 |
Space Engineering & Consultant |
|
·
MAERSK OIL
QATAR. (Well head platform, water injection
platform, compressor modules, Flare platform and
Accommodation platform, riser and
J-tube design and engineering for HYUNDAI HEAVY INDUSTRIES.) |
|
Deputy vice president/
Engineering Manager |
2001.11 - 2002.7 |
Yoo Il Engineering & Architect Co., Ltd |
|
·
MAERSK OIL
QATAR. (Well head platform, water injection
platform, compressor modules, Flare platform and
Accommodation platform, Riser and
J-tube design and engineering for HYUNDAI HEAVY INDUSTRIES.) |
|
Supervisor Engineering Manager |
2001.4 -2001.11 |
Yoo Il Engineering & Architect Co., Ltd |
|
·
Eardo offshore
measuring platform in Cheju Island.
(Korea ocean research, institute, Korea) |
|
Engineering Manager/
Supervisor |
2001.04- 2001.11 |
Yoo Il Engineering & Architect Co., Ltd |
|
·
AMENAM / LANTAY / KIZOMBA
FPSO-offshore Plant Platform, (HUNDAI Heavy Industry CO., Ltd,
Korea) |
|
Engineering Mgr/
Supervisor |
2000.05- 2001.04 |
Yoo Il Engineering & Architect Co., Ltd |
|
·
Thalassopolis sea
hotel in Inchon city (Archi’esse co.,
Ltd, Korea) |
|
Engineering Manager |
1999.08- 2000.05 |
Hyundai Heavy Industries Co., Ltd |
|
·
GIRASSOL-FPSO,
MPG/ELF, France (Engineering of topside
structure, deepwater mooring analysis, Tow motion
analysis and construction
design/engineering.) |
|
Manager |
1999.04- 1999.08 |
Hyundai Heavy Industries Co., Ltd |
|
·
Business/ FPSO
Mooring/Motion/Topside Loadout Method study |
|
Manager |
1999.01-1999.3 : Manager |
Hyundai Heavy Industries Co., Ltd |
|
·
RBS 8M
(Semi-submersible Drilling Unit), USA
(Engineering of Float-off in Ulsan Bay and Barge Deck Check, Stability
analysis of load-out case,
Mooring analysis during sea-trial test |
|
Manager |
1997.10-1998.12 |
Hyundai Heavy Industries Co., Ltd |
|
·
P33&P35 FPSO
(Floating Production System Offloading), Petrobras, Brazil (Engineering of
Vessel motion in sea water,
Engineering of Topside
Structure Design and Fatigue Analysis, Engineering of Turret, Overhead
Structure
and Superstructure
design/Fatigue/Foundation) |
|
Manager |
1998.5- 1998. 8 |
Hyundai Heavy Industries Co., Ltd |
|
·
Kwang an Bridge,
Pusan City (Installation
engineering, Transportation motion Analysis) |
|
Manager |
1996.2- 1997.10 |
Hyundai Heavy Industries Co., Ltd |
|
·
PING-HU Project –
CHINA (Engineering of Jacket
Design/In-place/Earthquake/Fatigue analysis and Soil Data description. |
|
Manager |
1995.10-1996.2 |
Hyundai Heavy Industries Co., Ltd |
|
·
RAVVA Project -
Command Petroleum industries, India,
pvt. (Construction work for Plant Structures & Civil Works,
Basic Design of Equipment Foundation and
pile) |
|
Manager |
1994.11-1995.10 |
Hyundai Heavy Industries Co., Ltd |
|
·
Engineering work for
SBHT Project in INDIA. (Construction
for Submarine pipeline and Terminal of SBHT Project) |
|
Senior Engineer |
1994.1 - 1994.11 |
Hyundai Heavy Industries Co., Ltd |
|
·
SBHT Project (gas
trunk line)
·
ONGC (Engineering of
Main Pipeline (221km-42inch), Engineering of onshore
·
Pipeline
(21km-42inch), Engineering of offshore Platform Modification
·
(BPA&BPB Platforms),
Engineering of onshore Plant terminal &Valve station
·
(3No.), Engineering
of offshore terminal &Valve station (7No.), Engineering of
HDD (Horizontal Directional Drilling) for
River crossing |
|
Senior Engineer |
1993.10 - 1994.1 |
Hyundai Heavy Industries Co., Ltd |
|
·
VIETNAM, PHASE -I
Submarine Pipeline (Engineering of Main pipeline (107 km- 10inch.),
Engineering of Onshore
Pipeline and terminal (17km -
16inch), Engineering of Offshore/Onshore Terminal & Valve station.) |
|
Senior Engineer |
1993.1 -1993.10 |
Hyundai Heavy Industries Co., Ltd |
|
·
NQP.L-II AND NPC (ONGC)
Submarine Pipeline Riser Design Engineering and coordination (Work done in
Ulsan) |
|
Senior Engineer |
1992.2-1993.1 |
Hyundai Heavy Industries Co., Ltd |
|
·
NQP/L-II AND NPC (ONGC)
Submarine pipeline (Basic Engineering of Pipelines (Work done in
Singapore) |
|
Senior Engineer |
1991.2-1992.2 |
Hyundai Heavy Industries Co., Ltd |
|
·
Conventional center
(Zone A) of Singapore. (Responsible
for installation engineering and connection design
of structure/check of drawings) |
|
Project Engineer |
1990.6-1991.2 |
Hyundai Heavy Industries Co., Ltd |
|
·
Ceres deck tank
(vessel) of Ceres Co., Ltd. Greece.
Responsible for Basic Design and Engineering of Vessel Tank,
Engineering of Heat Exchanger. |
|
Project Engineer |
1989.10-1990.5 |
Hyundai Heavy Industries Co., Ltd |
|
·
Heera process complex
of oil and natural gas commissioning,
India. (Responsible for the Load out Engineering and
the Construction,
transportation, fabrication aid design and engineering, Submarine pipelines
review and HPF jacket
in-place, Fatigue, Earthquake, Launching and upending and pile derivability
engineering) |
|
Project Engineer |
1989.10-1990.5 |
Hyundai Heavy Industries Co., Ltd |
|
·
Samsung Oil Co., Ltd.
in Ulsan, Korea (Responsible for
the concrete structural engineering, In-place, connection, pile
foundation, earthquake and concrete
fatigue, piping and vessel tank engineering) |
|
Project Engineer |
1988.6-1989.10 |
Hyundai Heavy Industries Co., Ltd |
|
·
Iraq crude oil pipeline Trans
Saudi Arabia project (IPSA) phase –II (Responsible for the construction,
Loadout,
transportation, fabrication engineering
and etc) |
|
Project Engineer |
1987.7-1988.6 |
Hyundai Heavy Industries Co., Ltd |
|
·
Takula "WIP" project
of Cabinda Gulf Oil Co., Ltd., Angola.
(Responsible for the construction, Loadout,
transportation, fabrication engineering and
etc) |
|
Project Engineer |
1986.3-1987.1 |
Hyundai Heavy Industries Co., Ltd |
|
·
Exxon SYU project
(two 8 legged jacket). Responsible for Load out and fabrication engineering |
|
Project Engineer |
1985.12-1986.3 |
Hyundai Heavy Industries Co., Ltd |
|
·
South Bassein Complex
(4 legged drilling platform and 8 legged process platform, 4 legged flare
platform) of oil &
natural gas commissioning of
India. (Responsible for In-place, Earthquake,
Pile derivability, Transportation and
construction engineering, etc) |
|
Engineer |
1984.12-1985.12 |
Hyundai Heavy Industries Co., Ltd |
|
·
SH (ONGC) project.
Responsible for Transportation, Loadout engineering and fabrication
drawing/check |
|
Engineer |
1983.12-1984.11 |
Hyundai Heavy Industries Co., Ltd |
|
·
NQ (ONGC) project.
Responsible for Transportation and Loadout engineering and Fabrication aid
design, etc |
|
Engineer |
1983.4-1983.12 |
Hyundai Heavy Industries Co., Ltd |
|
·
WIN process platform
(ONGC) project. Responsible for Loadout engineering and drawing/check. |
|
Engineer |
1982.3-1983.4 |
Hyundai Heavy Industries Co., Ltd |
|
·
MARJAN ZULUF of
Arabian America oil co., Saudi Arabia.
Responsible for Loadout engineering and drawing/check |
|
Engineer |
1981.10-1982.3 |
Hyundai Heavy Industries Co., Ltd |
|
·
Development of the
Champion-7 field complex. Responsible for Loadout / sea-fastening
drawing/check |
Education & Licenses:
|
Degree/License |
Dates |
Organization |
|
A.E. |
1984.3-1988.2 |
Ulsan University, Korea |
|
M.S.C.E. |
1991.2-1993.8 |
Ulsan University, Korea |
|
Structural Engineer |
1997.5.6 |
APEC, Registration No: 97149030006T |
|
Geotechnical Engineer |
1999.9.20 |
APEC, Registration No: 99158090005Z |
|
Structural Engineer |
2001.7.31 |
Registration No: ROK-ST-01-0013 |
Papers and Software:
|
Dates |
Subject of Paper |
|
1993.6 |
Pile Drive-ability and Resistance analysis in
Corals |
|
1996.10 |
A Case Study of Horizontal Directional
Drilling System for Onshore River
Crossing Construction |
|
1996.10 |
A Case Study of Bottom Pulling System for
River Crossing Construction |
|
1996.10 |
Analysis of the Stone Column Resistance and
Drains in Soft Soil |
|
1999.6 |
Development of Loadout Methodology for
Topside of FPSO |
|
1999.6 |
Analysis of Resistance for the Earth-tie
Method on Soft Sand Soil |
|
1999.6 |
Development of Flexibility Structural
Analysis Method for Fabrication of
Large Fixed Offshore Platform |
|
1999.6 |
A Case Study of Motions between Two Body
Vessels |
|
1999.6 |
Deepwater FPU Mooring analysis with Riser and
Buoy |
|
2000.4 |
A study of pile resistance considering pile
group effects |
|
Software Proficiency |
Program |
|
ZenScad, CivilFEM+Ansys, Patran+Nastran,
Offpipe, TriFlex, Kliq, Midas civil, Lusas,
Opinas, ZenPipe, Sap2000,
ZenMoor, SACS-EDI(HIGH-LEVEL), MOSES-ULTRAMARINE
(HIGH-LEVEL), GT STRUDL(LOW-LEVEL),
STRU CAD*3D-ZENTEC (MIDDLE-LEVEL),
Language(Fortran), Micro-Excel,
Micro-word, Inter-net and Other Program |
|
Software Development |
Program Utilitization |
|
Local bearing stiffener design P/G,
Pile-soil-interaction P/G, Pipeline and Riser
inplace design P/G, Flange
check P/G, Beam Hole reinforcement P/G,
Monorail Design P/G, Beam overstressed member
verification P/G,
Dynamic Blast analysis P/G, Drop object
plastic design P/G, Ship Impact design P/G,
Hoop stress calculation P/G, Joint-can
verification P/G, Pedestal crane fatigue P/G,
Earth wall design P/G, Padeye design P/G,
Wave force generation P/G,
Mud-mat design P/G, Hydrostatic collapse design P/G,
Vortex verification P/G (wind, wave,
current), Slamming member design P/G,
Vibration foundation design P/G, Barge motion
inertia force generation P/G,
Hull scantling P/G, Hull collision design
P/G, Hull stability quick check P/G,
Bolt connection design P/G, Wave scatter
simulation P/G,
Wave height (1year, 5year, 10year,
20year,…100year) generation P/G, Slope stability P/G,
Soil liquefaction verification P/G, Hull |
|