|
| |

Mr. H. T. Lim, Sr.
VP, Project Management, Fabrication & Installation
Professional Record:
|
Position |
Dates |
Company |
|
Sr. Vice President |
2005 - Present |
OPT, Project Support to Associated Companies |
|
Consultant |
2003 - 2005 |
Offshore Project Installation at Hyundai Heavy
Industry |
|
Vice President |
2002 - 2003 |
Offshore Project Installation at Hyundai
Heavy Industry |
|
Project Director |
2001 - 2003 |
Offshore Project Installation at Hyundai
Heavy Industry, including Major Offshore Projects for Platform Jackets,
Platform Decks, Hook-up, Commissioning, Pipe - Laying etc.
|
|
General Manager
/Director |
1993 - 2001 |
Offshore Project Management at Hyundai Heavy
Industry
(Including Projects for India, China, Israel,
Iran, Southeast
Asia)
Led yard and field activities for
platform fabrication and
installation. Implemented
procedures for
efficient
production
& field management. |
|
·
India: NQP Offshore Platform
§ NPC
Offshore Platform
§ LQ
Offshore Platform
§ LAKSIMI
Pipe-Laying & Modification
§
MBPT Pipe-Laying &
Terminal, 10 Projects
·
China: Weijou
Platform/Pipe-Laying
Projects.
·
Thailand: Benchamas & Bongkot Platform
& Pipe-Laying Projects |
·
Iran: South Pars PH2/3
Pipe-Lay
Soroosh/Nowrooz Platform & Pipe-Lay
· Taiwan:
CPC Pipe-Laying
· Israel:
Rutenburg Coal Unloading Jetty
· Indonesia:
PGN Pipe-Lay, West Natuna Pipe-Lay
· Vietnam:
White Tiger Pipe-Lay & Platform
· Korea:
Dong Hae Platform and Pipe-Lay
|
|
Senior Manager |
1989 - 1993 |
Jacket Fabrication Department of HHI, Ulsan |
|
·
Led and performed for
the fabrication, loadout and seafastening of the following works
-
§ 3
Turnkey Project for ONGC, India
-
§ BP
Brage
Jacket Fabrication Project
-
§ Jackets
for Heera Process Platform Complex Project
-
§ Jackets
and Deck Structures for Marine Terminal of IPSA Phase-II Project
|
|
Manager |
1984 - 1988 |
Jacket Fabrication Department of HHI |
|
· Performed
node fabrication of San Miguel Julius Platform for Cities Service Oil & Gas
Co., U.S.A. and
SYU jacket (Harmony at 42,000-mtons, tallest
jacket in the world in 1985 and Heritage at 38,000-mtons)
for
Exxon Co., U.S.A.
· Performed
the yard assembly and roll up operation of the following projects:
-
§ ICP/ICW
Process Platform Jackets
-
§ Julius
Platform Jacket
-
§ Exxon
SYU Jackets 'Harmony' (42,000 MT) and 'Heritage' (38,000 MT)
|
|
Assistant Manager |
1983 - 1984 |
HHI (Ulsan) |
|
·
Performed tubular
fabrication and jacket assembly of following projects.
-
§ Phase
II of NQ Complex for Oil & Natural Gas Commission, India: One 8 leg
jacket and one 4 leg
-
jacket, pile (Ф 1,372 MM), thickness
38-mm : Total Weight 5,460 M/T
-
§ WIN
Process Platform for Oil & Natural Gas Commission, India. One 8 leg
jacket, pile (Ф 1,219 MM),
-
thickness 44-mm. Total Weight 4,473
M/T
-
§ Water
injection Well Platform WI-2, WI-3, WI-4, WI-5 4-Leg Jacket, four units.
Total Weight 8,878 M/T
-
§ Marjan
Offshore Project (GOSP #2 & #3) for ARAMCO,
Saudi Arabia:
o
8 Leg Jacket units, 6
Leg Jacket 2 units
o
4 Leg Jacket units,
pile (Ф 1,219 MM), thickness 51-mm. Total Weight 16,549 M/T
-
§ Zuluf
Offshore Project (GOSP #3 & #4) for ARAMCO,
Saudi Arabia:
o
8 Leg Jacket 4 units,
6 Leg Jacket 2 units
o
4 Leg Jacket 8 units,
pile (Ф 42”), thickness 51-mm. Total Weight 16,549 M/T
-
§ Peninsular
Malaysia Offshore Gas Project for Petronas Carigali SDN. BHD. Malaysia, 8
Leg, 4 Leg and 3 Leg jacket. Total Weight: 5,588 M/T
|
|
Assistant Manager |
1980 - 1982 |
QA Department Responsible for Quality of HHI,
Ulsan |
|
·
Assisted Control and
Quality assurance in following projects.
-
§ Steel
Structure for Seo-hae Thermal Power, Go-Jeong
-
§ Thermal
Power Plant, Samcheonpo Thermal Power Plant.
-
§ Steel
Structure for Ko-ri Power Plant, Wolsung Nuclear Power Plant,
Nag-dong Bridge
-
§ Conductor
fabrication of IWAKI jacket for Esso Production Japan. During this
period, assigned to
-
task force team for survey to award AISC certificate,
and prepared DNV audit for QA system
|
|
Senior Engineer |
1977 - 1980 |
Hyundai Engine Manufacturing Co. |
|
·
Responsible for
casting design, molding and melting the iron castings for marine diesel
engine and
heavy machinery. |
|
Engineer |
1974 - 1977 |
Hyundai Heavy Industries Shipbuilding
Division |
|
· A
quality control engineer, for supervision of fit-up and welding during the
construction of
various vessels. |
Education, Certifications & Licenses:
|
Degree/Certificate |
Organization |
|
B.S. |
Chunnam National University, Metallurgical
Engineering |
|
CWI |
Certified Welding Inspector by AWS License |
|