Resume  of Mr. H. T. Lim

OPT Home Introduction Press Releases Key Personnel OPT Experience

 

 

Back Next

Mr. H. T. Lim,  Sr. VP,  Project Management, Fabrication & Installation

Professional Record:

Position

Dates

Company

Sr. Vice President

2005 - Present

OPT, Project Support to Associated Companies

Consultant

2003 - 2005

Offshore Project Installation at Hyundai Heavy Industry

Vice President

2002 - 2003

Offshore Project Installation at Hyundai Heavy Industry

Project Director

2001 - 2003

Offshore Project Installation at Hyundai Heavy Industry, including Major Offshore Projects for Platform Jackets, Platform Decks, Hook-up, Commissioning, Pipe - Laying etc.  

General Manager

/Director

1993 - 2001

Offshore Project Management at Hyundai Heavy Industry

(Including Projects for India, China, Israel, Iran, Southeast

Asia)

Led yard and field activities for platform fabrication and

installation.  Implemented procedures for efficient

production & field management.

·  India:  NQP Offshore Platform

§  NPC Offshore Platform

§  LQ Offshore Platform

§  LAKSIMI Pipe-Laying & Modification

§   MBPT Pipe-Laying & Terminal, 10 Projects

·  China:  Weijou Platform/Pipe-Laying

 Projects.

·  Thailand: Benchamas & Bongkot Platform & Pipe-Laying Projects

·   Iran:   South Pars PH2/3 Pipe-Lay

    Soroosh/Nowrooz Platform & Pipe-Lay

·  Taiwan:  CPC Pipe-Laying

·  Israel:  Rutenburg Coal Unloading Jetty

·  Indonesia:  PGN Pipe-Lay, West Natuna Pipe-Lay

·  Vietnam:  White Tiger Pipe-Lay & Platform

·  Korea:  Dong Hae Platform and Pipe-Lay

 

Senior Manager

1989 - 1993

Jacket Fabrication Department of HHI, Ulsan

·        Led and performed for the fabrication, loadout and seafastening of the following works

§  3 Turnkey Project for ONGC, India

§  BP Brage Jacket Fabrication Project

§  Jackets for Heera Process Platform Complex Project

§  Jackets and Deck Structures for Marine Terminal of IPSA Phase-II Project

Manager

1984 - 1988

 Jacket Fabrication Department of HHI

·  Performed node fabrication of San Miguel Julius Platform for Cities Service Oil & Gas Co., U.S.A. and

SYU jacket (Harmony at 42,000-mtons, tallest jacket in the world in 1985 and Heritage at 38,000-mtons)

for Exxon Co., U.S.A.

·  Performed the yard assembly and roll up operation of the following projects:

§  ICP/ICW Process Platform Jackets

§  Julius Platform Jacket

§  Exxon SYU Jackets 'Harmony' (42,000 MT) and 'Heritage' (38,000 MT)

Assistant Manager

1983 - 1984

HHI (Ulsan)

·         Performed tubular fabrication and jacket assembly of following projects.

§  Phase II of NQ Complex for Oil & Natural Gas Commission, India:  One 8 leg jacket and one 4 leg

 jacket, pile (Ф 1,372 MM), thickness 38-mm : Total Weight 5,460 M/T

§  WIN Process Platform for Oil & Natural Gas Commission, India.  One 8 leg jacket, pile (Ф 1,219 MM),

 thickness 44-mm.  Total Weight 4,473 M/T

§  Water injection Well Platform WI-2, WI-3, WI-4, WI-5 4-Leg Jacket, four units.  Total Weight 8,878 M/T

§  Marjan Offshore Project (GOSP #2 & #3) for ARAMCO, Saudi Arabia:

o        8 Leg Jacket units, 6 Leg Jacket 2 units

o        4 Leg Jacket units, pile (Ф 1,219 MM), thickness 51-mm.  Total Weight 16,549 M/T

§  Zuluf Offshore Project (GOSP #3 & #4) for ARAMCO, Saudi Arabia:

o        8 Leg Jacket 4 units, 6 Leg Jacket 2 units

o        4 Leg Jacket 8 units, pile (Ф 42”), thickness 51-mm.  Total Weight 16,549 M/T

§  Peninsular Malaysia Offshore Gas Project for Petronas Carigali SDN. BHD. Malaysia, 8 Leg, 4 Leg and 3 Leg jacket.  Total Weight: 5,588 M/T

Assistant Manager

1980 - 1982

QA Department Responsible for Quality of HHI, Ulsan

·         Assisted Control and Quality assurance in following projects.

§  Steel Structure for Seo-hae Thermal Power, Go-Jeong

§  Thermal Power Plant, Samcheonpo Thermal Power Plant.

§  Steel Structure for Ko-ri Power Plant, Wolsung Nuclear Power Plant, Nag-dong Bridge

§  Conductor fabrication of IWAKI jacket for Esso Production Japan.  During this period, assigned to

task force team for survey to award AISC certificate, and prepared DNV audit for QA system

Senior Engineer

1977 - 1980

Hyundai Engine Manufacturing Co.

·       Responsible for casting design, molding and melting the iron castings for marine diesel engine and

heavy machinery.

Engineer

1974 - 1977

Hyundai Heavy Industries Shipbuilding Division

·   A quality control engineer, for supervision of fit-up and welding during the construction of

various vessels.

Education, Certifications & Licenses:

Degree/Certificate Organization

B.S.

Chunnam National University, Metallurgical Engineering
CWI Certified Welding Inspector by AWS License
Send mail to jen@optkorea.com with questions or comments about this web site.