
Project Particulars:
•
Owner:
Petrobras,
Brazil
•
Location:
Marlim in the
Campos
Basin,
Brazil
•
Scope of Work:
VLCC and VLOO Conversion into FPSO
Engineering, Procurement, Construction, Integration,
Mechanical Completion and Commissioning
•
Project Duration:
-
P-33
:
Apr. 1996 ~ Jun.1998
-
P-35
:
Jun. 1996 ~ Dec. 1998
OPT Personnel Experience:
Executive management, engineering, procurement and fabrication and
fabrication management. Technical qualification and
technical/commercial bid preparation.