Mr. Y. T. Baek,   Manager, Project Coordinator,

                             Transportation & Installation

Professional Record:

Position

Dates

Company

Project Coordinator

2005.3 – Present

OPT

Director

2005.3 – Present

Blue Marine Contractors PVT.LTD, Mumbai, India

Project Coordinator

2004.4 – 2005.2

Submarine Pipeline (Based in India)

MUT Project

Client  : Oil and Natural Gas Corporation Ltd. (U.S.$ 580 million)

Ensure Hyundai Heavy Industries and its Subcontractors achieve performance in compliance with their

scope or work / Contractual and commercial correspondence and satisfy Client ONGC.

-.               O.D.30 inch x 204 Km (Oil Trunk Line)

-.               O.D.28 inch x 204 Km (Gas Trunk Line)

-.               O.D. 12 ~ 28 inch x 99 Km (Feeder Line)

-.               P/F Modification  :6 Nos.

-.               Subsea PLEM & Lateral Installation:32 Nos.

Project Manager

2002.12 – 2004.4

HHI

MHB Project (Based in India)

Client  :  Oil and Natural Gas Corporation Ltd. (U.S.$ 38 million)

Ensure Hyundai Heavy Industries and its Subcontractors achieve performance in compliance with their

scope / Contractual and commercial correspondence and satisfy Client ONGC.

 The EPIC project involve material supply, pipe coating, laying

-.              Pipelay:  8~12” x 49 Km (Rigid Pipeline)

-.              Installation of Flexible Pipeline : 8” x 10 Km

-.              Deck Modification and Commissioning : Seven(7)  Nos.

Project Coordinator

2001.8 – 2002.11

HHI

Lakshmi Field Phase-1 Development Project (Based in India)

Client  :  Carin Energy India Pvt Ltd (U.S.$ 36 million)

Review main contract and subcontract scope of works and contractual deliverables.  Ensure

Hyundai Heavy Industries and its Subcontractors achieve performance in compliance with their

scope / Contractual and commercial correspondence. / Verify, approve and settle subcontractor’s

 invoices change orders and claims.

The EPIC project involve material supply, pipe coating, laying 24” x 32 Km and  12” x 0.1 Km pipelines

and Two(2) Topside Deck Fabrication, Installation and Commissioning.

Project Coordinator

2000.8 – 2001.6

HHI

Water Injection Pipeline Replacement Project (Based in India)

Client  :  Oil and Natural Gas Corporation Ltd.(U.S.$ 29 million)

Review main contract and subcontract scope of works and contractual deliverables.  Ensure

Hyundai Heavy Industries and its Subcontractors achieve performance in compliance with their

scope / Contractual and commercial correspondence. / Verify, approve and settle subcontractor’s

invoices change orders and claims.

The EPIC project involve material supply, pipe coating, laying 4” to 12” infield pipelines

 and topside modifications. 

Project Co-ordinator

(Deputy Project Manager)

1999.11 – 2000.7

HHI

Replacement of Submarine Pipeline for Mumbai Port Trust (Based in India)

Client  :  Mumbai Port Trust in India (U.S.$ 60 million)

 

Review main contract and subcontract scope of works and contractual deliverables.  Ensure

Hyundai Heavy Industries and its Subcontractors achieve performance in compliance with their

scope / Contractual and commercial correspondence. Prepare and submit change order and claims for

additional or variation work to Client.  Meeting with Client and Subcontractors.  Verify, approve and

settle subcontractor’s invoices change orders and claims.

 

The EPIC project involved material supply, pipe coating, laying 8” to 42” Offshore pipelines

and associated onshore segments with 3 manifold station with shed construction.

-.              6 Nos. of Shore pulling work

-.              3 Nos. of Surface tie-in work

-.              2 Nos. of Receiver station.

-.              2 Nos. of ICCP

Assistant

Project Manager

1997.10 – 1998.9

HHI

Unloading Terminal Jetty for Rutenberg Power Plant (Based in Ashkelon, Israel)  

Client  :  Israel Electric Company, Ashkelon ( U.S.$ 80 milion)

 

Follow-up engineering document preparation, submission and approval / Define subcontract package and scope of work, follow-up evaluation of technical & commercial bids and award / Manage construction activities of between Hyundai Heavy Industries Co., Ltd. , Subcontractors and Israel Electric Company.

Construction Marine Jetty and Terminal which can accommodate 260,000 DWT Coal Carrier 

Senior Project Engineer

1996.6 – 1997.7

HHI

AMDP-30 Project for BSP ( U.S.$ 12 million) (Based in K.B, Brunei)         

Client  :  Brunei Shell Petroleum Company Limited

Define subcontract package and scope of work, follow-up evaluation of technical & commercial bids

and award / Define material requirement and follow-up procurement and delivery / Manage

personnel, equipment and construction activities of between Hyundai Heavy Industries Co., Ltd.

and Subcontractors / Brune Shell Petroleum Company Limited.

The EPIC project involved material supply, pipe coating, laying 2 no. x 12” x 2.4 km by

Rentis Method / 1 nos. x Steel Jacket with 700 Tons and Platform.

Senior Project Engineer

1996.2 – 1996.6

HHI

PETCHBURY TERMINAL PROJECT ( U.S.$ 11 million)  (Based in Ulsan, Korea)

Client : PETCHBURY TERMINAL CO., LTD.

 

Review project scope of work, schedule and all planning, progress monitoring, submission and approval

of Document required as per Contract / Define subcontract package and scope of work, follow-up

evaluation of technical & commercial bids.

The EPIC project involved material supply, Jetty Construction, Laying 3 nos. x 16” x 6 km by

Shore Pulling Method.

Senior Project Engineer

1994.10 – 1996.1

HHI

South Bassein Hazira Trunkline Project ( U.S.$ 120 million) (Based in Mumbai, India)

Client  :  Oil Natural Gas Corporation Limited

Review project scope of work, schedule and contingency plans, resource needs / Supervise all

planning, progress monitoring, / Define subcontract package and scope of work, follow-up

evaluation of technical & commercial bids and award Manage personnel, equipment and

construction activities of between Hyundai Heavy Industries Co., Ltd. and Subcontractors

and Client.

The project involved Laying 1 no. x 42” x 220 km by Conventional offshore laying Method

and 1 no. x 42” x 22 km Cross Country Pipeline 

Project Engineer

1992.8 – 1994.5

HHI

NPC, NQP & L-ABCDE Project ( U.S.$ 1 Billion) (Based in Mumbai, India)

Client  :  Oil Natural Gas Corporation Limited

Review project scope of work, schedule and approval of Document required as per Contract. 

Define subcontract package and scope of work, follow-up evaluation of technical & commercial

bids and award.

The EPIC project involved material supply, Jacket and Platform, Laying various size of

pipeline x 200 km by conventional offshore laying method.

Chief Officer

1984.5 – 1991.11

LASCO SHIPPING COMPANY in Portland, U.S.A

Supervise and manage the loading and discharging of cargoes in ports / Crew, Cargo gears and

Winches / maintenance of Vessel / Carry out Survey of Cargo laden in Vessel.