Mr. Y. T. Baek, Manager, Project
Coordinator,
Transportation & Installation
Professional Record:
|
Position |
Dates |
Company |
|
Project Coordinator |
2005.3 – Present |
OPT |
|
Director |
2005.3 – Present |
Blue Marine Contractors PVT.LTD, Mumbai,
India |
|
Project Coordinator |
2004.4 – 2005.2 |
Submarine Pipeline (Based in India) |
|
MUT Project
Client : Oil and Natural Gas Corporation
Ltd. (U.S.$ 580 million)
Ensure Hyundai Heavy
Industries and its Subcontractors achieve performance in compliance with
their
scope or work / Contractual and commercial correspondence and satisfy
Client ONGC.
-.
O.D.30 inch x 204 Km (Oil Trunk Line)
-.
O.D.28 inch x 204 Km (Gas Trunk Line)
-. O.D.
12 ~ 28 inch x 99 Km (Feeder Line)
-. P/F
Modification :6 Nos.
-. Subsea PLEM & Lateral
Installation:32 Nos. |
|
Project Manager |
2002.12 – 2004.4 |
HHI |
|
MHB Project (Based in India)
Client : Oil and Natural Gas Corporation Ltd. (U.S.$ 38 million)
Ensure Hyundai Heavy Industries and its
Subcontractors achieve performance in compliance with their
scope /
Contractual and commercial correspondence and satisfy Client ONGC.
The EPIC
project involve material supply, pipe coating, laying
-. Pipelay: 8~12” x 49 Km (Rigid Pipeline)
-. Installation of Flexible
Pipeline : 8” x 10 Km
-. Deck Modification and
Commissioning : Seven(7) Nos. |
|
Project Coordinator |
2001.8 – 2002.11 |
HHI |
|
Lakshmi Field Phase-1 Development Project (Based in
India)
Client : Carin Energy India Pvt Ltd (U.S.$
36 million)
Review main contract and subcontract scope of
works and contractual deliverables. Ensure
Hyundai Heavy Industries and its Subcontractors
achieve performance in compliance with their
scope / Contractual and commercial
correspondence. / Verify, approve and settle subcontractor’s
invoices change orders and claims.
The EPIC project
involve material supply, pipe coating, laying 24” x 32 Km and 12” x
0.1 Km pipelines
and Two(2) Topside
Deck Fabrication, Installation and Commissioning. |
|
Project Coordinator |
2000.8 – 2001.6 |
HHI |
|
Water Injection Pipeline Replacement Project (Based in
India)
Client : Oil and Natural Gas Corporation
Ltd.(U.S.$ 29 million)
Review main contract and subcontract scope of
works and contractual deliverables. Ensure
Hyundai Heavy Industries and its Subcontractors
achieve performance in compliance with their
scope / Contractual and commercial
correspondence. / Verify, approve and settle subcontractor’s
invoices change orders and claims.
The EPIC project involve material supply, pipe coating, laying 4” to
12” infield pipelines
and topside modifications.
|
|
Project Co-ordinator
(Deputy Project Manager) |
1999.11 – 2000.7 |
HHI |
|
Replacement of Submarine Pipeline for
Mumbai Port Trust (Based in India)
Client : Mumbai Port Trust in India (U.S.$
60 million)
Review main contract
and subcontract scope of works and contractual deliverables. Ensure
Hyundai Heavy
Industries and its Subcontractors achieve performance in compliance with
their
scope / Contractual
and commercial correspondence. Prepare and submit change order and claims
for
additional or
variation work to Client. Meeting with Client and Subcontractors.
Verify, approve and
settle subcontractor’s
invoices change orders and claims.
The EPIC project
involved material supply, pipe coating, laying 8” to 42” Offshore pipelines
and associated
onshore segments with 3 manifold station with shed construction.
-. 6 Nos.
of Shore pulling work
-. 3 Nos.
of Surface tie-in work
-. 2 Nos.
of Receiver station.
-. 2 Nos.
of ICCP |
|
Assistant
Project Manager |
1997.10 – 1998.9 |
HHI |
|
Client : Israel Electric Company,
Ashkelon ( U.S.$ 80 milion)
Follow-up engineering document preparation,
submission and approval / Define subcontract package and scope of work,
follow-up evaluation of technical & commercial bids and award / Manage
construction activities of between Hyundai Heavy Industries Co., Ltd. ,
Subcontractors and Israel Electric Company.
Construction Marine
Jetty and Terminal which can accommodate 260,000 DWT Coal Carrier |
|
Senior Project Engineer |
1996.6 – 1997.7 |
HHI |
|
AMDP-30 Project for BSP ( U.S.$ 12
million) (Based in K.B, Brunei)
Client : Brunei Shell Petroleum Company
Limited
Define
subcontract package and scope of work, follow-up evaluation of technical &
commercial bids
and award / Define material requirement and follow-up
procurement and delivery / Manage
personnel, equipment and construction
activities of between Hyundai Heavy Industries Co., Ltd.
and
Subcontractors / Brune Shell Petroleum Company Limited.
The EPIC project
involved material supply, pipe coating, laying 2 no. x 12” x 2.4 km by
Rentis Method / 1 nos. x Steel Jacket with 700 Tons and Platform.
|
|
Senior Project Engineer |
1996.2 – 1996.6 |
HHI |
|
PETCHBURY TERMINAL PROJECT ( U.S.$ 11
million) (Based in Ulsan, Korea)
Client : PETCHBURY TERMINAL CO., LTD.
Review project scope of work, schedule and all
planning, progress monitoring, submission and approval
of Document required as per Contract / Define
subcontract package and scope of work, follow-up
evaluation of technical & commercial bids.
The EPIC project involved material supply, Jetty
Construction, Laying 3 nos. x 16” x 6 km by
Shore Pulling Method.
|
|
Senior Project Engineer |
1994.10 – 1996.1 |
HHI |
|
South Bassein Hazira Trunkline Project (
U.S.$ 120 million) (Based in Mumbai, India)
Client : Oil Natural Gas Corporation
Limited
Review project scope of work, schedule and
contingency plans, resource needs / Supervise all
planning, progress monitoring, / Define
subcontract package and scope of work, follow-up
evaluation of technical & commercial bids and
award Manage personnel, equipment and
construction activities of between Hyundai Heavy
Industries Co., Ltd. and Subcontractors
and Client.
The project
involved Laying 1 no. x 42” x 220 km by Conventional offshore laying Method
and 1 no. x 42” x 22 km Cross Country Pipeline |
|
Project Engineer |
1992.8 – 1994.5 |
HHI |
|
NPC, NQP & L-ABCDE Project ( U.S.$ 1 Billion) (Based in
Mumbai, India)
Client : Oil Natural Gas Corporation
Limited
Review
project scope of work, schedule and approval of Document required as per
Contract.
Define subcontract
package and scope of work, follow-up evaluation of technical & commercial
bids and award.
The EPIC project
involved material supply, Jacket and Platform, Laying various size of
pipeline x 200 km
by conventional offshore laying method. |
|
Chief Officer |
1984.5 – 1991.11 |
LASCO SHIPPING COMPANY in
Portland, U.S.A |
|
Supervise and manage
the loading and discharging of cargoes in ports / Crew, Cargo gears and
Winches / maintenance
of Vessel / Carry out Survey of Cargo laden in Vessel.
|
Education:
|
Degree |
Date |
Organization |
|
B.S. |
1984 |
Korea Maritime University, Nautical Science |
|